Greetings and welcome to the official project bloy for the 2018 painting project at Bridges of Arbor Lakes in Maple Grove! We are excited to be back onsite this year!

 

Bridges at Arbor Lakes Route Map

Route Map @ Bridges at Arbor Lakes

 

Welcome Video

 

Wednesday, July 11th: Good afternoon!

Big news in World Cup soccer, yesterday in the semi-finals, France beat Belgium and today Croatia will face England. That game is on at 1pm if you want to watch! This will be the first time in 28 years that England has been in a semi-final match. The winner will then take on France in the final on Sunday, 7/15. 

With the bot of rain yesteday, the crew is finishing their painting on the last building as well as completing some add-on work. They should be wrapping up in the next day or two. 

Thank you so much for having us back! It has been our pleasure sprucing up your buildings. Have a great rest of the summer!

Tuesday, July 10th: Good morning! The crew is not onsite today due to the rain. They'll resume painting tomorrow and wrap up the remainder of the work. Thanks!

Monday, July 9th: Good afternoon residents of Bridges at Arbor Lakes. We hope you had a safe and happy 4th of July as well as a great rest of the weekend! 

The crew is starting their prep and painting on Building #6 today and will likely finish that building at the end of the day tomorrow. We've also been contracted to complete some additional work, which should be wrapped up by the end of the week. 

Bridges painting on front elevatios

Twinning on the front elevation of Building #5.

Bridges door frames

Hermes paints the door frame on Building #5.

Tuesday, July 3rd: 

Rain Delay - Tuesday, July 3rd

The crew will resume painting after the holiday on Thursday, July 5th. They are wrapping up on #3 and #4 with the decks. NOTE: Please move cars from under your decks during the painting of your building - as the crew will need unobstructed access to complete their painting. Thank you! 

They'll also begin on Building #5 on Monday. 

We have a bit of a skeleton crew in our office the rest of the week as we're spending time with family and enjoying the holiday, but we will resume with daily updates on Monday. Thanks and have a happy and safe 4th of July and a great rest of the week! 

Friday, June 29th: Hello and TGIF! 

It's a hot one out there folks; we hope you're staying cool! 

We have a request from our crew - please move your cars from under your decks to allow them unobstructed access to areas for painting. Thanks, we really appreciate it! 

Have a great weekend!

Thursday, June 28th: Hello!

The crew has started prep and painting on Building #3. We have a request from the crew that while we are working at your unit to please not park your car under the upper deck - this will allow them unobstructed access while painting. Pictures coming soon!

We'll be pressure washing Buildings 5 & 6 tomorrow, Friday - please close your windows and also move your cars from under the decks to allow access to the areas for pressure washing. Thanks! 

Wednesday, June 27th: Good afternoon! 

The rain is finally behind us and the crew is resuming their prep and painting on Buildings #1 and #2. They are hopeful to begin on Building #3 tomorrow with prep work and starting painting. 

We'll also be pressure washing Buildings #5 and #6 as your association is having a portion of the driveways sealcoated as not to interfere with their work. Thanks!

Bridges alex paint window trim

Alex paints the main level window trim.

Bridges Hermes paint window trim 2

Hermes reaches on his tip toes to paint the upper window trim.

Tuesday, June 26th: Hello!

We've had some overnight rain thus halting our painting today. The crew will soon be turning the corner onto Oakview Lane to begin the 'row home' style buildings. In addition to painting the entry transom side lights, front door frames, and entry pillars, we'll be painting the deck skirts, support posts, and railings of the decks above your garages. 

Project Update with Isaac. 

Monday, June 25th: Good afternoon residents of Bridges at Arbor Lakes. We hope you all had a great weekend! 

The crew is pressure washing Buildings 5 & 6 today as well as continuing their painting on Buildings 1 & 2. 

Bridges paint 12376

Nestor paints the entry way of the of the 12376 Unit. 

Bridges PW 4

Hermes pressure washes the front entry pillars. 

Friday, June 22nd: Good afternoon and TGIF! 

Isaac is checking in with site supervisor Hermes. 

The crew is continuing on Buildings 1 & 2. We'll also be pressure washing Buildings #5 & #6 on Monday, 6/25 and Tuesday, 6/26. Please check back on the blog for updates as to when we'll begin prep and painting on your building. Each building is taking about a week to complete, for reference. Thanks and have a great weekend! 

Bridges alex paint on building 1

Alex paints one of the entry porches on Building #1.

 BRidges Hermes thumbs up

Thumbs up from Hermes - this guy had a birthday this week!

Thursday, June 21st: Hello residents of Bridges at Arbor Lakes. 

The crew has moved on to Building 2 . They are prepping one of the building sections- tape and covering windows. They've also starting spraying some areas. 

Alex and nestor prep building 2

Alex and Nestor cover windows and tape edges before spraying. 

Bridges Hermes spray

Hermes sprays the window bump out. 

Wednesday, June 20th: Good afternoon! 

The rain has subsided and the crew is back onsite. With the delay due to rain, we're continuing on the 1st Building for a few days longer before we move onto the 2nd Building. 

BRidges hermes caulk

Hermes caulks around the entry pillars. 

Tuesday, June 19th: Happy Tuesday!

It seems we're having a bit of deja vu. The crew is rained out again today - well keep you updated as to when they'll be back. Stay Dry!

Monday, June 18th: Good morning! With the weekend rain, the crew was not onsite on Saturday and will not be out today also due to weather. We're hopeful the rain is done for the day and surfaces can dry out so we can resume our prep and painting for tomorrow. Thanks!

Friday, June 15th: Hello and TGIF!

Mother Nature has ordered up some 'Hot & Humid' weather for the weekend with the possibility of showers/storms scattered throughout. You can take your chances and head outdoors for numerous Farmer's Markets as well as the Stone Arch Bridge Festival happening over the weekend. Don't forget about Father's Day on Sunday! 3 cheers for all the dads, grandpas, uncles, great-grandpas, and all of the dudes that have influenced you!

The crew is continuing on Buildng 1 with prep and painting. 

Pictures coming soon!

Thursday, June 14th: Good morning residents of Bridges at Arbor Lakes!

The crew is off and running in Maple Grove. They're starting with prep work - caulk scrape, etc on the first building and then they'll also begin painting.  

Bridges nestor paint over hang

Nestor paints the upper window bump out. 

Bridges alex prep and painting column

The entry columns are taped off and Alex is giving them a fresh coat of paint. 

Friday, June 8th: Hello and TGIF! 

The crew is off and running at your project in Maple Grove! We've started with pressure washing Building 1 & 2. We'll then resume the project and begin prepping and painting once the surfaces have dried out thoroughly and we anticipate this to be early next week. Thanks and have a great weekend!

Bridges PW 1

It feels great to be back at your association. Pressure washing is in progress!

Bridges PW

Teamwork to thoroghly wash and prep the surfaces for painting. 

Wednesday, June 6th: Hello and welcome to your project blog for this year's painting project at Arbor Lakes! It feels great to be back onsite. 

This year's project entails the prepping and painting of 6 designated buildings. We've attached a site map, with highlighted buildings and the completion route depicted as well. Please refer to this map as we provide updates throughout the project. 

We'll begin with pressure washing Buildings 1 & 2 on Friday, June 8th. We'll be washing the areas designated for completion: hardie window bumpouts, front door frames, decorative wood brackets, decking support posts, deck skirts, and previously painted window trim. 

When we are working at your buildings, please move items as needed to allow for safe and unobstructed access. Please note, it is not necessary for you to completely clear your deck of contents. 

We anticipate each building to take approximately 1-2 weeks to complete, weather pending and you can follow progress and schedule updates right here on the blog. Thanks! 

 

 

 

 

2017 Project Details - See Below

-----------

 

Greetings and welcome to the official blog for this summer's painting project at Bridges of Arbor Lakes in Maple Grove! We are looking forward to being back onsite and working with and for you again this year! 

Bridges at Arbor Lakes Revised Route

Route Map @ Bridges at Arbor Lakes

 bridges schedule 7 10

Tentative Finishing Schedule- Updated Monday 7/10

 

Tuesday, July 18th: Good afternoon Bridges at Arbor Lakes. We'll be posting notices on the ors that have not been painted tas of yet tomorrow. If you'd like to sign up for a specific time, you can do so below in the 'Leave a Comment' section of the blog. Please leave your address and time requested. We'll be onsite on Saturday, 7/22 from 9am until 1pm and will take appointments on the hour. If you are unavailable or do not contact us, we'll paint your door while in the closed position. Please reach out with any questions and thank you again for all of your participation thus far! 

Time Saturday, July 22nd
9am 8141 Oakview Lane N, 8066 Norwood Lane N, 1 spot available
10am 8145 Oakview Lane N, 2 spots available
11am 3 spots available
12pm  8125 Magnolia Lane N, 2 spots available
1pm 3 spots available

 

 

 

Time Thursday, July 13th
9am  8051 Magnolia Lane N, 3 spots available
10am 8132 Norwood Lane, 3 spots available
11am 4 spots available
12pm  4 spots available
1pm 4 spots available
2pm 8147 Oakview Lane N, 3 spots available
3pm 4 spots available
4pm 8033 Magnolia Lane N, 3 spots available
5pm 4 spots available

 

Time Friday, July 14th
9am 8059 Magnolia Lane N, 3 spots available
10am 8143 Oakview Lane N, 3 spots available
11am 4 spots available
12pm 4 spots available
1pm 8083 Magnolia Lane N, 3 spots available
2pm 4 spots available
3pm 8124 Norwood Lane N, 3 spots available
4pm 8149 Oakview Lane N, 3 spots available
5pm 4 spots available

 

Time Saturday, July 15th
9am 8058 Norwood Lane N, 3 spots available
10am 8109 Magnolia Lane N, 3 spots available
11am 8139 Oakview Lane N, 3 spots available
12pm 4 spots available
1pm 8009 Magnolia Lane N, 3 spots available
2pm 4 spots available
3pm 4 spots available
4pm 8016 Norwood Lane N, 3 spots available
5pm 4 spots available

 

Monday, July 17th: Good morning and happy Monday! We hope you all had a great weekend and stayed cool! 

The crew has completed painting on the exteriors of the designated buildings and painted doors on Saturday. There are about 10 doors that remain and we will be back on Saturday, 7/22. The hours for painting will be posted in the next day or two and then we will take appointments on the hour as done previously. Thanks! 

Friday, July 14th: It's going to be hot, hot, hot tomorrow so make sure to drink lots of water and try and stay out of the heat. If you're looking for some fun and free stuff to do this weekend, the City Pages puts out Freeloader Friday- a summary of various happenings around the Twin Cities. Movies in the Park- Zootopia at Lake Harriet is playing tonight, the Ramset County Fair is all weekend, and then a Bastille Day block party at Barbette in Uptown on Sunday are a few that stand out.

The crew has been painting doors and we want to thank you for making appointments and opening your doors to have them painted! If you haven't already, comment below on the blog with an available time and your address and we'll add you for tomorrow.

Thanks and have a great weekend!

Wednesday, July 12th: Good morning and happy Wednesday! 

One of the original pop- star and diva, Diana Ross performed at Northrop Auditiorium last night. She brought her smile, sparkles, hit songs, and enthusiasm to a full house of eager fans. Maybe we can take her hit, "I Will Survive" to get through this heat and the rest of the week! 

The crew is painting at Buildings #5-#6 today. As a reminder, tomorrow they'll begin knocking at homes to paint your front doors. If you'd like to make an appointment for a specific time to have your door painted, please comment below on the blog with address, date, and time and we'll get you signed up. Or feel free to call our office: 763-559-5296. 

We'll be making appointments on the hour between 9am and 5pm. Also, the door will need a minimum of 2 hours to remain open and dry throroughly after being painted. Thanks! 

 Bridges paint siding 5

Buildings #5 & #6 are underway. 

bridges bldg 5

Ladders up and painting the window frames. 

Tuesday, July 11th: Hello! It's going to be another hot one, folks!! Stay cool and drink lots of water!

The crew is working on Building #4-6 and on Building #4 they're painting the stairs as well. 

*Update - we'll be painting front doors starting Thursday, 7/13 and going through Saturday, 7/15 from 9am - 5pm. Our crew members will be knocking on doors and if you are available, please open the doors to have a crew member paint your door. 

You may also schedule a specific day/time to have your door painted right here on our blog. Scroll down to the bottom of this page and in the "Leave a Comment" section, specify your address, the day, and time. We will take appointments between 9am - 5pm ON THE HOUR (i.e. 1250 Kerry Lane, Friday, 3pm) and there are 4 slots available each hour. You may also call our office at 763-559-5296 to make an appointment. 

Once the doors are painted, they'll need a minimum of 2 hours to be left open. Roell Painting will not be responsible for nor will they perform touch ups for damages caused by closing doors too early. 

Thank you in advance for your cooperation and participation!

bridges at arbor lakes stair prep 2

Prepping the steps on Building #4 for painting. 

Bridges at arbor lakes stair prep

Making sure the steps are clean and free of debris. 

Monday, July 10th: Good morning residents of Bridges at Arbor Lakes! We hope you had a great weekend! 

We've updated the finishig schedule as of this morning. The crew will be painting on Buildings #4 & #5 and they'll also begin prepping on Building #6. 

 Bridges at arbor lakes sidingand window trim cesar

Cesar paints the siding and window trim. 

bridges at arbor lakes paint pillars

Juan balances just right to paint the front pillar. 

bridges at arbor lakes paint front stoop

The front stoop areas are painted. 

bridges at arbor lakes alvaro paint garage pillars

Alvaro paints the garage pillars. 

Friday, July 7th: Good morning and happy Friday! With the short week, we have no complaints of it already being Friday. It looks like a pretty good weather weekend with Saturday being the most promising. There a lot of free activities happening around the Twin Cities- here's a link from City pages. Also the Basilica Block Party is happening tonight and tomorrow. All info, including available tickets can be found here. 

The crew is continuing prep and painting on both buildings 4 & 5. They'll also be pressure washing building 6. 

Have a great weekend! 

Bridges prep on 4

Another day and another ladder up. 

Thursday, July 6th: Good morning! It's going to be a hot one today folks- make sure you're staying hydrated and out of the heat. The good news is that it looks like we'll see some relief tomorrow, the weekend, and next week! 

weather 7 6

The crew is continuing to prep and paint at Building #3 today. Quick update: the crew was not able to pressure wash Buildings #6 today due to some issues with the machine, but they'll pressure wash tomorrow. 

Bridges building 3

Prep work on the deck side of Building #3.

Wednesday, July 5th: Hello residents of Bridges at Arbor Lakes! 

We hope you all had a great weekend and a happy 4th of July!

The crew is prepping and painting on the 8148 building today. 

Oak Grove 8148 bldg

Ladders up!

Thursday, June 29th: Good afternoon! Looks like we're between rain days and the crew is onsite prepping the first 2 buildings for painting. They're caulking, priming, and taping. 

Bridges caulk prep

Caulking the pillars. 

Bridges prep work

Prep work being done on the street side of Buildings 1 & 2. 

Monday, June 26th: Good morning and happy Monday! We hope you all had a great weekend. 

The project is off and running! The crew has started pressure washing the first 3 buildings along the route. They'll pressure wash today and if needed, tomorrow. Once the surfaces have dried, they'll be back to begin prepping and painting. The buildings will be painted in the same order they were pressure washed. 

Bridges sprayer

Juan preps the sprayer. 

Bridges PW garage door

The garage frame gets a good spraying. 

Bridges pressure wash

Spraying ensure clean surfaces so the paint can adhere optimally. 

Wednesday, June 21st: Goodmorning and welcome to the official blog for this year's painting project at Bridges at Arbor Lakes. We are looking forward to working with you again! 

This year's project will include painting on 5 buildings, designated above in blue. We'll be painting front door frames, entry support pillars/soffits, window trim, and deck railings and skirts. We've posted the route we'll take to complete the project and we'll also post a tentative finishing schedule of a more specific time frame you can expect us at your building. 

We'll be onsite on Monday, 6/26 and Tuesday, 6/27 to begin with pressure washing of several buildings and then we'll begin our prep work and painting on Wednesday, 6/28. We'll work in phases, meaning we'll wash a grouping of buildings and then paint those buildings. Then we'll repeat this cycle until all buildings are complete. When your building is designated for pressure washing, we kindly ask that you remove any small items from the exterior of your building and then move items on your deck to allow to access for washing and then painting. No need to completely clear your deck. 

We anticipate the project with take 2-3 weeks in entirety to complete. Stay tuned here on the blog for progress updates, finishing schedule, and any changes or weather delays that may occur. 

Thank you again for having us and we'll see you on Monday. Have a great rest of the week and weekend! 

Isaac Vogel

Project Manager

Ph: 612-578- 2438

  • This email address is being protected from spambots. You need JavaScript enabled to view it.

Nick Roell

Project Manager

Ph: 763-559-5296

  • This email address is being protected from spambots. You need JavaScript enabled to view it.

Comments (61)

  • Thom Olson

    22 July 2017 at 14:59 | #

    Hello,
    We were scheduled for last Saturday at 4, but they came at noon, when we were about to leave, so our door wasn't painted. They said they would come back on Monday, but it didn't look like painting was happening that day.
    We'll be gone until 2 today- will that be too late?
    Thom (8016 Norwood)

    reply

    • Dana

      22 July 2017 at 17:47 | #

      HI Thom- sorry for the missed connection on painting earlier this week. Our crew had their last appointment at noon today so they will have just painted your door while closed if you were not home. Thanks!

      reply

      • Thom

        24 July 2017 at 18:59 | #

        Hi Dana,

        Our door hasn't been painted. Is there another day scheduled?

        Thanks,
        Thom

        reply

        • Dana

          24 July 2017 at 19:40 | #

          Hi Thom- We can have someone out there to paint your door in the next day or two - at your convenience. Please let me know what works for you. Feel free to email me directly: dana@roellpainting.com Thanks!

          reply

  • Cole

    20 July 2017 at 15:07 | #

    8125 Magnolia Ln N, July 22 sometime around Noon please

    reply

    • Dana

      21 July 2017 at 13:22 | #

      Hi Cole - I have you set for Saturday at noon. Thanks!

      reply

  • Alexander

    19 July 2017 at 23:28 | #

    8145 Oakview Ln N. We are available Saturday morning at 10am. Our deck was also never painted. When will that be done?

    reply

    • Dana

      20 July 2017 at 01:12 | #

      Alexander- You're all set for Saturday at 10am. Let me check into what happened with your deck getting missed and I'll get back to you. Thanks!

      reply

      • Alexander Gornakov

        24 July 2017 at 21:38 | #

        Dana, any word on our deck?

        reply

  • Cathy D

    19 July 2017 at 21:16 | #

    Hi again, can I schedule 9am Sat for painting door at 8066 Norwood Lane N? Thanks!

    reply

    • Dana

      19 July 2017 at 21:23 | #

      Hi Cathy- You're all set for Saturday at 9am. Thanks!

      reply

  • Cathy D

    19 July 2017 at 20:53 | #

    Hi again, can I sign up for Sat, July 22 at 9am? 8066 Norwood Lane North. Thanks, Cathy D

    reply

  • Cathy D

    19 July 2017 at 20:50 | #

    Hi again, can I sign up for Sat, July 22 at 9am? 8066 Norwood Lane North. Thanks, Cathy D

    reply

  • Mary Dunning

    18 July 2017 at 22:56 | #

    8141 Oakview Lane at 9AM July 22

    reply

    • Dana

      19 July 2017 at 13:26 | #

      Morning Mary - You're all set for Saturday at 9am. Thank you for signing up!

      reply

  • Megha

    18 July 2017 at 21:04 | #

    Hello - Just curious whether the siding by the door gets painted as well? They might have missed mine otherwise? please let me know. Thanks!
    -Megha

    reply

    • Megha

      18 July 2017 at 21:06 | #

      8124 Norwood Ln N. I noticed the window got painted but the siding on the walls by the door and stairs are not, just curious. thanks!

      reply

      • Dana

        18 July 2017 at 21:46 | #

        Hi Meghan- Thanks for the message. Siding was not included in this year's project. Included areas were "front door frames, garage door frames, entry pillars/soffits, window trim, patio door frames & deck railings/skirts." Please let us know if you think any of these areas was missed. Thanks!

        reply

        • Megha

          19 July 2017 at 15:10 | #

          Thank you for your reply, Dana. Good to know. I think everything in the list is covered :) if I come across anything i'll let you know. Have a lovely day and thank you!

          reply

  • Cole

    15 July 2017 at 20:41 | #

    8125 Magnolia Ln N, Saturday 4 pm please.

    reply

    • Dana

      15 July 2017 at 21:37 | #

      Hi Cole-- sorry, but our crew has wrapped up for the day. We'll be back next Saturday to finish the remaining doors. More info on times/sign up to come. Thanks!

      reply

  • Thom Olson

    14 July 2017 at 02:41 | #

    8016 Norwood Lane, Saturday, 4 PM

    reply

    • Dana

      14 July 2017 at 13:13 | #

      Morning Thom- You're all set for Saturday at 4pm. Thanks for signing up!

      reply

  • Chuck crone

    14 July 2017 at 02:04 | #

    8149 oakview lane north 4 pm Friday

    reply

    • Dana

      14 July 2017 at 13:12 | #

      Morning Chuck - You're all set for today at 4pm. Thanks!

      reply

  • Marv Goergen

    13 July 2017 at 21:57 | #

    I am home Friday 7/14 between 1:00-4:00 for painting. My address is 8083 Magnolia Lane N

    reply

    • Dana

      14 July 2017 at 13:11 | #

      Marv- I've got you down for 1pm today. Thanks!

      reply

    • Dana

      13 July 2017 at 22:10 | #

      Hi Marv- Let me get back to you with a specific time since there is a gap in scheduling. I'm waiting to hear back from my job supervisor to see what time he prefers. Thanks!

      reply

  • Marv Goergen

    13 July 2017 at 21:55 | #

    I will be home Friday 7/14 between 1:00-4:00 for painting.

    reply

  • Dejan Nikolic

    13 July 2017 at 14:16 | #

    Friday July 14th 9am - 8059 Magnolia Ln N

    reply

    • Dana

      13 July 2017 at 14:31 | #

      Morning Dejan - You're set for Friday at 9am. Thanks!

      reply

      • Dejan Nikolic

        13 July 2017 at 14:38 | #

        Thank you Dana.

        reply

  • Taylor Olson

    13 July 2017 at 12:09 | #

    8143 Oakview Lane North - Friday, 10am

    reply

    • Dana

      13 July 2017 at 13:41 | #

      Morning Taylor- You're all set for Friday at 10am. Thanks!

      reply

  • Becky Willett

    13 July 2017 at 10:14 | #

    May we please have a 1 pm Saturday appointment for door painting at 8009 Magnolia Ln?

    Thank you,, Becky

    reply

    • Dana

      13 July 2017 at 13:23 | #

      Morning Becky - You're all set for Saturday at 1pm. Thanks for signing up!

      reply

  • Mimi drew

    13 July 2017 at 02:11 | #

    8058 Norwood lane n. I need a Saturday am apt please

    reply

    • Dana

      13 July 2017 at 13:22 | #

      Morning Mimi- I scheduled you for Saturday at 9am. Thanks!

      reply

      • Mimi Drew

        13 July 2017 at 15:13 | #

        thank you

        reply

  • Megha

    13 July 2017 at 01:33 | #

    Hello - the crew knocked on my door and I had asked for Friday at 5pm, Can I move that time up to 3pm on Friday instead? 8124 Norwood. Thank you!

    reply

    • Dana

      13 July 2017 at 02:06 | #

      HI Megan- Sure thing; I'll change you to Friday at 3pm.

      reply

      • Megha

        13 July 2017 at 16:44 | #

        thank you!

        reply

  • Kathy

    12 July 2017 at 23:58 | #

    Cancel door painting at 8108 Norwood Ln. N. at noon, Thursday, 7/13
    They painted it Wednesday, 7/12

    reply

    • Dana

      13 July 2017 at 02:04 | #

      Hi Kathy- Thank you for the update!

      reply

  • Lisa Ostlund

    12 July 2017 at 23:52 | #

    I'm not sure if my last message went through, but I'd like 8051 Magnolia Lane N door painted 9 am Thursday if possible.

    reply

    • Dana

      13 July 2017 at 02:04 | #

      Hi Lisa- I'll add you to the schedule for tomorrow at 9am. Thanks!

      reply

    • Dana

      13 July 2017 at 02:04 | #

      Hi Lisa- I'll add you to the schedule for tomorrow at 9am. Thanks!

      reply

  • Mary Steffen

    12 July 2017 at 20:59 | #

    Please schedule door painting for 8033 Magnolia Lane North for Thursday, July 13th at 4:00 PM. The trim looks amazing!!!! Thank you!!!

    reply

    • Dana

      12 July 2017 at 21:32 | #

      Hi Mary - Thanks for the feedback! You are all set for Thursday at 4pm.

      reply

  • Ryan Eikanger

    12 July 2017 at 20:37 | #

    8139 Oakview Ln N, Saturday July 15, 11am

    reply

    • Dana

      12 July 2017 at 20:39 | #

      Hi Ryan - Thanks for signing up. You are all set for Saturday at 11am.

      reply

  • Kathy Jacobsen

    12 July 2017 at 19:15 | #

    Paint Door Thursday, July 13, 12:00 (noon)
    8108 Norwood Lane North

    reply

    • Dana

      12 July 2017 at 20:34 | #

      Hi Kathy- You are set for Thursday at noon. Thank you for signing up!

      reply

  • Cathy D

    12 July 2017 at 18:37 | #

    8066 Norwood Lane N, Thurs at 9am, or earlier if possible. I'm leaving town around 10 am for the weekend. (Can you do it next Mon?)

    reply

    • Cathy D

      12 July 2017 at 19:41 | #

      and actually my front door looks very good, doesn't seem to need new painting.

      reply

  • Derek Nelson

    12 July 2017 at 15:51 | #

    8147 Oakview Lane N, Thursday, 2pm

    reply

    • Dana

      12 July 2017 at 18:28 | #

      Hi Derek- You're all set for Thursday at 2pm. Thank you!

      reply

  • Paula

    12 July 2017 at 14:16 | #

    8109 Magnolia, Saturday July 15, 10am

    reply

    • Dana

      12 July 2017 at 14:25 | #

      Morning Paula- You're all set for Saturday at 10am. Thanks!

      reply

  • Jen Peterson

    12 July 2017 at 11:38 | #

    8132 Norwood Lane, Thursday, 10am

    reply

    • Dana

      12 July 2017 at 13:48 | #

      Morning Jen- You're all set for Thursday at 10am. Thanks for signing up!

      reply

Leave a comment

You are commenting as guest.

Request Your Free Estimate Today! Get A Free Estimate

facebook btn
linkedin btn
twitter btn
Reoll Painting

facebook btnlinkedin btntwitter btn