Monday: Painting IN PROGRESS

Welcome to the official blog for our project at a private residence in Orono. We are looking forward to completing our project of painting and enameling throughout this home and cannot wait to see the transformation. 

 

Monday, June 26th: Good afternoon and happy Monday! We hope you all had a great weekend! 

Most of the flooring is being installed throughout, so we've been working to paint around those areas and stay out of their way. WE're hoping to finish by week's end and will be back next week to complete touch ups and other misc. work.

Peterson bedroom bathroom

We are loving the bright pop of color in one of the kids' bathrooms! 

Peterson cabinets doors sprayed

Letting the shelves dry.

Peterson basement padded room

One of the basement areas we are enameling. 

Friday, June 23rd: TGIF! The crew is working on the main level off of the kitchen and also finishing the remaining areas in the basement. Sorry we didn't get any pictures today-- we'll have some progress photos Monday. We hope you have a great weekend! 

Thursday, June 22nd: Hello! We hope you're having a great week thus far! Things are really taking speed at this Orono home as we near the end of the project. We are finishing the area off of the kitchen also in the basement- the bar area and one of the rooms. 

Peterson girls bedroom 1a

One of the girls' bedroom and the bright wallpaper. 

Peterson girls bedroom 1

This is just Darling. 

Peterson main level 1

The first coat of enamel is sprayed. 

peterson main level 2

Another view of this freshly enameled room. 

Peterson girls bedroom2

A matching accent wall in the other girls' bedroom. 

Wednesday, June 21st: Good morning! The crew is prepping walls- patching, filling holes, etc on the main level off of the kitchen as well as painting/prepping door frames and window frames. 

Peterson patch bondo walls on main level

Justin works to patch the walls on the main level off of the kitchen. 

Peterson paint window frame

Tadeo paints the window frame. 

Peterson wall patch in bathroom

Herson gets creative to patch the bathroom walls. 

Peterson tape prep door frames

Gerardo preps the door frame. 

Monday, June 19th: Good afternoon. We hope you had a great weekend and a Happy Father's Day! 

The crew is sanding on the main level and also spraying in the basement. 

Peterson Tadeo sand bondo

Tadeo sands the bondo off of the kitchen. 

Peterson Gerardo doors together

Gerardo puts the bathroom cabinets back together. 

Peterson ciro sanding

Ciro sands the wall and bondo on the main level. 

Peterson Andres paint ceiling

Andres paints the ceiling in the basement. 

Friday, June 16th: TGIF!

The flooring has been installed on the main level and the cabinets are being installed in the kitchen! Here are a few pictures our Job Supervisor jesse took while onsite this morning. Things are looking great as we're nearing project completion!

peterson cabinets 1

Kitchen cabinet progress! 

peterson cabinets

They are looking great! 

Peterson bathroom flooring

We don't usually have a toilet in the shower, but when you're installing new flooring, you do!

peterson bedroom complete

One of the bedrooms complete in 'Borrowed Light.'

Peterson billiard room

The Billiards Room is complete.

Peterson entry way handrail

The flooring is installed in entry way. 

Peterson first floor flooring

She's a beaut!

Peterson office flooring

Flooring is installed in the office

Peterson cabinet install

Kitchen Cabinets in progress

Thursday, June 15th: Good morning! 

The crew is completing enamel and wall painting in the basement as well as finishing up enamel detailing. 

Peterson Tadeo sand basement cabinet

Tadeo sands the cabinetry in one of the bathrooms. 

Peterson basement entry enamel finish wall patches

The basement walls have been sanded and prepped for the 2nd coat. 

Peterson enamel cabinetry glass front detailing

Painting the detailing on the office cabinetry. 

Tuesday, June 13th: We have an NBA Champion- the Golden State Warriors took the title last night. And Kevin Durant won the NBA Finals MVP, scoring at least 30 points each championship round game. Congrats to the Warriors!

The crew is working on some clean up today- putting outlet covers back on, attaching doors, and removing the plastic from the ceiling spraying on the 2nd level. 

Peterson gerardo puts door on

Gerardo puts one of the door back on the hinges. 

Peterson remove plastic from bathroom

Monday, June 12th: Good afternoon!

We have a new back-to-back reigning Stanley Cup Champion - the Pittsburgh Penguins! Last night's game was back and forth with many, many shots on goal and they went almost 3 periods without a score. It was in the last few minutes that Pittsburgh got the puck to bounce in after a shot on goal. The Predators couldn't align their players to score in the final minute and Pittsburgh ended up scoring into an empty net.  And now the 2016-2017 season has come to a close...we await on the NBA Finals results as Golden State (3-1) plays at home against Cleveland. 

The crew is spraying ceilings on the upper level, hence no pictures...everything is covered with plastic. Here are a few pictures of some finished and prepped areas on the main level. 

Peterson gel stain handrail

The gel stain is applied to the handrail. 

Peterson billiard room 1

Billiards Room. 

Peterson office 1

Office is prepped for the flooring. 

Peterson office 2

The office and mantle are complete. 

Friday, June 9th: Happy Friday! James Corden is always up to something and that something is usually pretty funny. He recently put together a surprise for Tom Cruise while he was in London. Corden pitched the idea of 'Tom's Cruise on The River Thames Cordon.' This included puns of all kinds relating to all things Tom Cruise and James himself while aboard the "cruise" ship. The duo even karaoke'd to 'Lovin' Feeling' from Top Gun! Check out the video to get your Friday started off with some fun! 

We're working on getting pictures from the crew and will hopefully post today/tomorrow. Thanks!

Thursday, June 8th: Greetings and Happy Thursday! It was exciting night last night for the Golden State Warriors and unfortunately a heartbreaking night for Cavaliers as Golden State brought their team to a 3-0 lead in the finals. Game 4 will be played tomorrow night in Cleveland and we can't predict the future, but we'd say it's a safe bet that Golden State has it in the bag. 

The crew is finishing up spraying the 2nd coat of the Down Pipe color. They've also started prepping and painting in the basement. 

Peterson downpipe sanded and patched

Another round of sanding and patching is complete. 

Peterson spraying down pipe final coat

After the prep is done, Justin sprays on the final coat of Down Pipe.

Peterson pitch black enamel sanding

Sanding in progress.

Peterson basement start 1

Primer and bondo applied to the basement fireplace. 

Peterson basement start

The Basement bar area is prepped for spraying. 

Wednesday, June 7th: Good afternoon! We are having another gorgeous day and work continues at this home with spraying the walls and patching areas where the wallpaper removal proved to be a bit challenging. Yet, the crew persists and the end is in sight for your project!

Peterson down pipe color finished spraying

The 'Down Pipe' color is sprayed and complete. 

Peterson first coat black blue walls

The 'Black Blue' is sprayed on the walls and ceilings of the office.  

Peterson bathroom first coat

The first coat in one of the bathrooms is complete. 

Peterson patching wallpaper walls

Herson patches the walls where the wallpaper was particularly difficult to remove. Patching the walls will yield a smooth finish once the paint is applied!  

Tuesday, June 6th: For all the hockey fans out there, we've got ourselves quite the match up. The Nashville Predators won 2 in a row at home against the Pittsburgh Penguins to tie the score to 2-2. Up next, the teams will face-off on Thursday in Pittsburgh. They'll alternate home ice for games 5, 6, and potentially 7. In NBA Finals news, the Golden State Warriors are up 2-0 in the series and the teams will face off on Wednesday in Cleveland. 4 wins will take the championship! 

 Sports aside, we have several pictures to post of the home's progress...

Peterson gerardo putting cabinetsback

Gerardo puts the cabinet doors back onto the office built-ins. 

Peterson bondo inbetween sprays

Bondo is applied to elicit a smooth finish. 

Peterson master bath complete

Is it just us, or is the tub calling our name?!

Peterson master bath enamel done

The master bath vanity is gorgeous!

Peterson bedroom borrowed light

Herzon paints the 2nd coat in one of the bedrooms. 

Monday, June 5th: Good morning! Apologies for the going the whole weekend without pictures, but here are a few to get your Monday started off right!

Pitch Black Enamel

The first coat of the Pitch Black enamel is sprayed on the bar area.

Peterson pitch black cabinets sprayed

The bar cabinets have been sprayed. 

Peterson first coat of shadow white

Herson brushes on the 2nd coat of Super White in the upstairs hallway. 

Peterson sanding between coats

Gerardo sands and patches the walls in between coats of Shadow White.

Friday, June 2nd: TGIF! It's Friday, it's beautiful out, and it's National Donut Day! Though we’re the first to argue that all the food holidays (National Cherry Popsicle Day is Aug. 26, in case you were wondering) are getting out of control, National Donut Day actually has legit history behind it. And it’s hard to resist a real reason to eat a doughnut. The day was created in 1938 to honor the Salvation Army “Donut Girls” who served doughnuts to soldiers on the front lines of World War I. We can toast a donut to that! 

The crew must be busy at work- no time for pictures this morning. We'll try and post some tonight or tomorow. 

Have a great weekend!

Thursday, June 1st: Happy June 1st!! We are happy to see the sun shining and have an 80 degree day to welcome the new month! 

The crew is finishing up the upper level enamel and bedroom wall painting as well as prepping the basement for enamel and painting. 

Peterson office enamel built ins

Can we say obsessed with this Black Blue enamel color?! 

Peterson master bedroom enamel

We're loving the 'on trend' grey in the master bedroom. 

Peterson jessicas closet

If we go missing, we'll be posted up in this gorgeous white and bright master closet. 

Peterson jessicas closet finishied

*picks up chin off of floor. 

peterson alexs bedroom

One of the bedrooms is glowing in 'Borrowed Light' from Farrow and Ball. 

Wednesday, May 31st: We can't believe May is coming to a close and June is right around the corner. We're hopeful the new month will bring more sunshine and less rain and if today is any indication of that- we'll take it! This warmer weather has us eager to use our outdoor grills and bbq! Thrillist's list of '100 Best Burgers In America' is out and Minnesota takes 4 of the spots. At #100, is Matt's Bar's Juicy Lucy, #86 is the Paddy Shack Burger from Half-Time Rec, #47 is the Parlour Burger, and #40 is Sainte Dinette's cheeseburger. Looks like we having some tasting to do! 

Peterson patching walls 1

Herson patches up the walls in between paint coats. 

Peterson rolling on paint

The new paint color is rolled onto the bottom chair rail. 

Peterson patching walls

Mr. Patchwork himself assists to prep the walls. 

Tuesday, May 30th: Good afternoon! We hope you enjoyed your 3-day weekend! 

Back to the grind we go! The crew is finishing up with the enamel that is the 'Super White' color and the walls and ceilings. The crew will start with the other colors tomorrow. 

peterson basement enamel bar

Basement bar enamel is sprayed. 

Peterson basement enamel mantel

Basement fireplace mantel is sprayed. 

Peterson spray grey eanmel color

The billiards room is looking great! 

Peterson super white 1st coat

 The entry way's ceiling and walls are sprayed. 

Peterson upstairs super white

One of the upstairs rooms looking 'Super White.'

Friday, May 26th: TGIF!!! We are putting in our hours in anticipation of a 3-day weekend! Lots accomplished at the home this week; by days' end, the crew will have finished enameling all of the main level and upstairs areas. The only portion remaining is the basement. Also, they've sprayed most walls and ceilings on main floor and upstairs. We are super impressed with their hard work and the transformation!

Have a great weekend! 

PetersonGerardo tape cabinet prep enamel

No shame if you need a few extra inches from a paint can! 

Peterson patch walls

Maybe a head lamp would be a good investment?

Peterson main floor powder room wallpaper removal

The last of the wallpaper is coming down in the main floor powder room.

Thursday, May 25th: Good afternoon! We've had our first sunny and 70 degree day in quite some time and we couldn't be happier! Several areas of the home have been finishes as far as enameling wall/ceiling painting goes and the crew is taking down all of the prep materials. 

Peterson Herson applying bondo to the woodwork

Herson patches areas of the walls before enameling. 

Peterson Giovanni taking down the plastic

Giovanni takes down the plastic covering from the master closet. 

Peterson gerardo patching bondo cabinet

Gerardo patches up the cabinetry.

Wednesday, May 24th: Hello and Happy Hump Day! 

The crew is painting the final coat in the master closet & bathroom. They are also putting the cabinets back together in one of the offices as well as prepping areas on the main floor for spraying the 'Plummet' enamel color, which is a gorgeous grey color and we can't wait to see it! 

Peterson sanding ceiling

Herzon sands the ceiling before the top coat goes on. 

PEterson offive cabinets back in place

Gerardo puts the office cabinetry back together. How awesome is Black Blue by Farrow & Ball?! 

Peterson prep for plummet color enamel

The last prep steps are being done on the main floor before the crew starts spraying the enamel. 

Tuesday, May 23rd: And here we are again, another rainy day. However, it is no obstacle for the crew in Orono. 

The crew is sanding the hallway walls between coats and then painting the 2nd coat. They are also sanding and prepping the banisters for staining. 

Peterson rolling on hallway wall paint

The hallway walls are brushed and rolled to perfection.

Peterson sanding railing for stain

The back stairwell railing gets sanded and prepped for staining. 

Peterson sanding walls for final coat of paint

Herson sands the walls between coats of paint. 

Monday, May 22nd: Happy Monday and we hope you had a great weekend! Lots of rain here in Minnesota, but hopefully you had clearer and brighter skies. 

The crew continues in Orono with prepping, sanding, and patching the walls. Over the weekend they completed patching and the first coat on the walls. We know the crews, as well as the rest of us are looking forward to the upcoming holiday and a 3-day weekend! I think we can all agree, we're working for the weekend

Peterson trim painting

Herson touches up the ceiling trim. 

Peterson taping off walls for painting

Not a day goes by without prep work. 

Peterson prep staircase spindles

Justin preps the entry way banister. 

Peterson stain sample

Stain sample on the banister.

Thursday, May 18th: Another rainy day here in Minneapolis... yet, your crew presses on! 

We are getting more paint colors approved by the designer so we can start painting some more of the walls and ceilings. 

Peterson cover outlets prep

Justin covers the outlet in preparation for painting.

Peterson cover cabinets to spray ceiling

Plastic goes up in the master closet in preparation of spraying the ceiling. 

Peterson cover cabinet in master

Herson tapes the cabinets before spraying the ceiling in the master closet. 

Wednesday, May 17th: Good afternoon! We are happy to report that all of the Super White enamel is sprayed. The areas and rooms with the remaining enamel colors are continuing to be prepped with taping, caulking, and sanding. Now that the Super White enamel is painted, the walls in the those areas/rooms can be painted. This will involve more prep work to cover the newly sprayed enamel. 

Peterson basement sanding primer

Herson sands the primer coat on one of the basement doors. 

Peterson sanding base

The baseboards get a quick sanding after the primer is applied. 

Peterson cover enamel to paint walls

Gerardo tapes around the freshly painted enamel so next they can paint the walls. 

Tuesday, May 16th: Though the weather seems to have cleared up for the moment, it looks like more rain either this afternoon and/or tomorrow. Good thing our crew is safe and sound inside and keeping busy prepping and spraying. Today, they're continuing to prep, tape, and put up plastic and also continuing to spray enamel. 

If you need a mid-day pick-me-up, here's the Will & Grace trailer that was released yesterday from NBC to perk up this rainy morning. The 12-episode revival kicks off this fall on NBC!

The gang's back together! 

Peterson vacuuming prep for enamel

Another crucial step of prep work- vacuuming to make sure surfaces are smooth. 

Peterson Justin covers in basement for overspray

Justin covers the basement doors to prevent overspray. 

Peterson Herson checks the caulk before final coat of enamel

Herson checks the caulking before the final coat of enamel. 

Peterson Gerardo put cabinets back in

Gerardo puts the cabinets back together post enamel. 

Peterson adres set up doors to spray

World's Strongest Man: Andres

Monday, May 15th: Good afternoon! We hope you had a great weekend; it certainly was nice here!

Though most of our crews were rained out this afternoon, work persists in Orono. The crew is continuing their prep work with sanding, bondo, and taping. Sanding ensures a smooth surface for the enamel, bondo is used to fill in all the imperfections in the wood, and taping so we can keep the enamel on the appropriate surfaces . These are all crucial steps to a beautiful finish. 

Progress update at our enamel project in Orono, MN. 

Peterson caulking prep

Caulk goes around the door frame. 

Peterson sand for smooth finish

Sanding for that smooth finish. 

Friday, May 12th: Happy Friday! 

The crew is busy spraying the white enamel throughout the house. Clothing coverings and face masks required : )

Peterson spray ceiling trim

The ceiling trim gets sprayed. 

peterson sand railing

Making sure the handrail is sanded and ready for enamel. 

Peterson sprayer mask

Quick spot check on the ceiling trim. 

Jimmy Fallon's #MOMQUOTES and just in time for Mother's Day!

Thursday, May 11th: Happy Thursday and cheers to a beautiful Minnesota day! Today happens to be the state's 159th Birthday. Minnesota joined the union back in 1858. Today we can celebrate all things Minnesota: 10,000 Lakes, Uff-da & Fargo references, hot dishes, Vikings loyalties, and all the snow! 

Today the crews started spraying the white enamel on the doors and cabinets. They're also continuing prep work in the  master bathroom and also some miscellaneous prep throughout the house. We can't wait to see this transformation come to life!

Peterson spray enamel

A steady hand sprays on the white paint.

Peterson vaccuum sanding dust

Justin vacuums to make sure there is no dust left behind. 

Peterson caulk cabinet trim

Gerardo caulks the cabinet trim in master closet.

Peterson enamel cabinet doors

The cabinets get their first coat of white enamel. 

Peterson enamel doors 1

The doors take their turn and get sprayed. 

Wednesday, May 10th: Mother Nature has again blessed us with some rain. I suppose we can't really complain as it will only make our grass greener and this project doesn't isn't affected by weather. 

Mother's Day is a short 4 days away, so here's your official head's up to get that card for your mom, grandma, aunt, godmother, sister, and all those who share their love, patience, and guidance with us! 

The crew is spraying the white enamel today ... awaiting some pictures. 

Tuesday, May 9th: Good afternoon! A bit of trivia for your Tuesday- Who recently tweeted that they'll be commemorating the 20th anniverary of the movie Titanic at the 2017 Billboard Music Awards? If you guessed Canadian superstar Celine Dion, you are correct! She will be singing "My Heart Will Go On" on May 21st to honor the 1997 film.

The white enamel color has been approved and we've got the green light! The crew is making sure all the surfaces are prepped and ready for spraying the enamel and depending on time, they'll start spraying today or tomorrow. 

Peterson door prep enamel

Gerardo preps the doors for enameling.

Peterson enamel prep 1

The next cover for 'Purple Rain'?! Justin tapes off the windows. 

Peterson enamel prep vacuum

Making sure we dot all of our i's and cross all of our t's! Next step: Enamel!

Friday, May 5th: Good morning and Happy Cino de Mayo!! We are celebrating the Mexican Army's unlikely victory over the French forces at the Battle of Puebla. We are celebrating Mexican culture with a fiesta lunch for our crews at Roell Painting this afternoon. We want to celebrate Mexican history and have a little fun as well!! 

fiesta

We'll be adding some pictures and an update shortly! 

Wednesday, May 3rd: Today the crew is prepping all of the woodwork in the basement- baseboards, cabinets, and door frames & window frames. The next step is priming those surfaces. The crew is also finshing the priming on wooden surfaces on the main and upper levels. The next step is enameling and we are awaiting on approval for the color matches and then we'll start applying the new and fresh colors!

 Peterson basement prep

Paper and tape-- never enough of those supplies for a painter. 

Peterson basement prep 1

Cabinet frames are ready for primer. 

Peterson basement prep 2

Bondo and sanding on the cabinet doors. 

Peterson bondo work

No that's not a smattering of red paint... lots of bondo prep on this window casing. 

Monday, May 1st: We can't believe it's already May; this year is flying by and we are ready for spring! 

The crews are continuing to prime the woodwork throughout the house. They're also removing wallpaper in the remaining bedroom/bathrooms. Once we've finishing priming the cabinets, trim, etc we can move forward with applying the approved colors for the wood surfaces. Things are coming along very smoothly!

Peterson billiard room primed

The Billiards Room is primed and ready to be painted. 

Peterson billiard room bar primed

The trim and cabinets of the bar off the Billiards Room are primed.

Peterson master bath wallpaper removal

We're saying goodbye to the last bit of wallpaper in the Master Bathroom.

Peterson sanding master bath faux finish

Herzon sands the faux finish on the Master Bathroom cabinets. 

Friday, April 28th: Happy Friday! Boy, are we glad to see the sun! It's been a roller coaster week for weather, but we are on-board with today's clear and sunny skies. 

Thorough prep continues for the crew at our residence project. They're covering all surfaces- flooring, windows, mirrors, etc. I wonder what the total amount of tape and painter's plastic used is? 

Peterson prep closet

The 'Hers' Master closet gets all covered and taped up. 

Peterson prep mirrors

The mirrors of the master bath are covered in plastic. Did you know plastic wrap is a painter's best friend?!

Peterson prep window cover

No surface left uncovered. 

Thursday, April 27th: Another dreary day and dare I admit it, a snowy day. That's Minnesota for you, though! The good thing is that this project isn't impacted by our confused Mother Nature. At the house today, we have a meeting of the minds with our Project Manager, Nick and the Designer to go over the details and nitty gritty of getting this house updated to a fresh and rejuvenated look! 

Peterson draw downs

Draw downs are ready for approval- Love this color palette of greys & neutrals. 

Peterson crew Florentino Giovanni Geraldo Ricardo Herzon

Only the finest at Peterson: Florentina, Giovanni, Gerardo, Ricardo, and Herzon.

Wednesday, April 26th: Good morning! The crew has been busy removing existing wallpaper throughout the house. They're also prepping the millwork with caulking and bondo. For anybody not totally familiar with bondo, essentially it's a glazing compound used to fill small imperfections in millwork. After the bondo is applied, it is then sanded prior to the application of the enamel coats, to ensure for a SMOOTH finish, the operative word being SMOOTH.  In fact, you might even say our painters are SMOOTH OPERATORS. Enjoy that throwback to Sade from 1984. 

Effective and thorough prep is essential to all projects, including this one- with covering of the floors, windows, and carpet. We'll be tackling the enameling of baseboards, windows, doors/frames, crown molding, beams, and mantels first and then the painting of the walls and ceiling will take place. In executing this order of process, we can eliminate a step of taping off the millwork and essentially work as efficiently as possible. 

Afternoon update: The crew is continuing their bondo and caulking of the wood work and also removing wallpaper in powder room and several bedrooms & bathrooms. 

Peterson entrypowder wallpaper removed

The entry powder room is free of wallpaper. 

Peterson matts office prepped for primer

The office is primer-ready!

Peterson Jess sitting room prepped for primer

Caulking the seams of millwork is one of the prep steps before enameling. 

Peterson poppys room finishing wallpaper

It's a labor of love to remove wallpaper- diligence and patience are key! 

Peterson wallpaper removal

This room is just about complete as the wallpaper comes down. 

Monday, April 24th: Good afternoon! Here are a few 'BEFORE' pictures from the house. 

Petersen entry way BEFORE

Peterson basement bar BEFORE

Peterson living room ceiling BEFORE

Peterson panel wall Before 1

And here are some 'PREP' pictures. The crew is careful to tape off the floors, hardware, and windows. The progression of our projects consist of thorough prep, priming and then painting. At this house, we'll be enameling window & door trim, cabinets, fireplace mantles, and the front staircase. We can't wait to see the "freshened" up look!

Peterson prep 2

 Peterson stair prep

Peterson prep cabinets

We'll continue to update the blog with progress pictures of the painting and enameling project. 

Stay tuned! 

Nick Roell

Project Manager

Ph: 763-559-5296

  • This email address is being protected from spambots. You need JavaScript enabled to view it.

Leave a comment

You are commenting as guest.

Request Your Free Estimate Today! Get A Free Estimate

facebook btn
linkedin btn
twitter btn
Reoll Painting

facebook btnlinkedin btntwitter btn