Greetings and welcome to your project blog for the painting project at your professional building. We are looking forward to working with and for you this summer!

 

Monday, July 9th: Hello and good afternoon! We hope you all had a safe and happy 4th of July and great rest of the weekend!

The crew has resumed their painting on the inner, loading dock areas. They're hopeful with a stretch of clear weather to wrap up by mid-week. 

Fernbrook paint loading dock area

The lifts makes it's way around the loading dock areas. 

Fernbrook marvin spray block wall

Marvin sprays the accent band on the block wall. 

Fernrbook views from the lift

Views from the lift. 

Tuesday, July 3rd: We've got a rain delay, folks but the crew will resume after the holiday on Thursday, 7/5 to resume painting. 

We have a skeleton crew in our office the rest of the week as we're spending time with family and enjoying the holiday, but we will resume with daily updates on Monday. Thanks and have a happy and safe 4th of July and a great rest of the week! 

Thursday, June 28th: Good afternoon! 

The crew is making their way around the building and is at the rear loading dock area. We wanted to say thank you again, so making sure cars are moved out of the way in the parking lot as to give the lift unobstructed access around the building! 

Fernbrook 4

Ladders up and away we go!

Tuesday, June 26th: Hello! 

Product Details - Sherwin Williams DTM Bonding Primer & Loxon 

Fernbrook thorough prep

Now that's what we call thorough prep!

Monday, June 25th: Good afternoon! 

Lots of progress made at 1940 Fernbrook! Today the crew is utilizing the boom on the North side of the building to spray the top accent band 'Pewtar Tankard' from Sherwin Williams. The East side of the building is almost complete with painting the block walls, accents, and awnings. 

We appreciate your cooperation to move cars from the parking lot to allow unobstructed accent for the painters and boom.

Fernbrook N side awning and accent band

The awning and accent band is complete. 

Fernbrook accents and awnings primed

The East side top accent band and awnings are primed and ready for paint. 

Friday, June 22nd: 

Isaac is checking-in onsite at 1940 Fernbrook. 

Wednesday, June 20th: Good afternoon! 

We've applied the samples and are moving forward with the Urbane Bronze color for the awnings. We've got quite the lift onsite to reach those upper awning areas and accent bands at the top of the building. 

Fernbrook awning and accent band

One of the completed awnings and accent bands. 

Fernbrook applying a primer

Applying "Amazing Gray" paint to the lock wall. 

Fernbrook lift onsite

Marvin is all strapped in and ready to spray your awnings. 

Wednesday, June 13th: Good morning! 

We are continuing our pressure washing today. If we can say your building is shaped like a 'C'- they are working on the inner portion of the 'C.'

We are using a turbo tip on our sprayers, which is more than we typically do on say a residential home since the material of the building is much different than typical siding. This allows us to really penetrate and clean the surfaces. 

We've also applied samples to two of the awnings with differing colors. 

Fernbrook PW 1

We are using a 'Turbo Tip' sprayer to maximize force used to clean and prep surfaces for painting. 

Fernbrook PW turbo tip

Blast off! 

Fernbrook prep and primer

Tape and plastic to cover the entry doors before we prime the awning.

Fernbrook primer awning

Marvin sprays primer on the awning. 

Monday, June 11th: Hello and welcome to the project blog for your upcoming painting project. We'll be starting your project with pressure washing of the building tomorrow, June 12th. Then once the surfaces have dried, we'll be back onsite to begin prepping and painting. Weather permitting, we anticipate we'll be back onsite on Thursday, 6/14. We'll then prep and paint the block and stucco walls, misc. metal surfaces, metal awnings, service doors/frames.

You can stay apprised of project details here on the blog as we'll update with progress, pictures, and any schedule changes if they come up.

Thanks so much for having us and we're looking forward togetting underway this week! 

Isaac Vogel

Project Manager

Ph: 612-578- 2438

  • This email address is being protected from spambots. You need JavaScript enabled to view it.

Leave a comment