Reoll Painting
Waycliffe II HOA - Wayzata

Waycliffe II HOA - Wayzata

Prep & Painting IN PROGRESS - 313/323 Building

Greetings and welcome to your project blog for the painting project at Waycliffe II HOA in Wayzata. We are looking forward to working with and for you!

Waycliffe route map

Route Map @ Waycliffe II

 

Welcome Video

 

Tuesday, August 14th: Hello and good afternoon!

The crew is continuing on the 3rd building and will then move onto prep on the 4th Building - 313/323. The plan, as long as the weather cooperates, is to be completed by Thursday, 8/16.

Waycliffe prep on 4

Tape, plastic, and caulk on Building 313/323. 

Waycliffe bldg 4 prep

 

Wayclife painting on deck spindles

Painting the railing spindles on Building #3. 

Waycliffe brush and roll on bldg 3

Ladders up to brush on the siding paint. 

Monday, August 13th: 

Progress update onsite with Isaac. 

Friday, August 10th: Good afternoon and TGIF! 

The crew is prepping and painting on the 2nd Building (358/368) and will finish tomorrow. They'll start the 3rd  Building (338/348) on Monday, 8/13 and plan to complete the last two buildings by Thursday, 8/16.

Waycliffe II bldg 2 paint

Prepping, priming, and painting on Building #2. 

Waycliffe II bldg 2

A perfect day to spray at Waycliffe II.

Thursday, August 9th: Hello! 

The crew has started to spray and paint on the 388/378 Building. 

waycliffe paint trim

Ladders up to paint the trim. 

Waycliffe painting window bump out

Painting the window bump out on the front elevation. 

Wednesday, August 8th: Good morning!

And they're off! The crew has started their prep work on the first building (388/378). 

Waycliffe cover and plastic

Tape and plastic to cover the windows on the 388/378 Building. 

Waycliffe prep on 1st building

Ladders up to caulk and prep the building. 

Monday, August 6th: Good morning and happy Monday! We hope you all had a great weekend!

The crew completed your pressure washing on Friday. With the weekend rain, your crew was put behind schedule and will now be starting your project on Tuesday or Wednesday. Thanks so much for your patience and we look forward to being back onsite soon! 

Thursday, August 2nd: Good afternoon! 

And they're off!! The crew has started your project with the first phase- pressure washing. Once completed, the substrates will need some time to dry out completely. We'll then return onsite to begin prepping and painting on the first building (388/378). We anticipate each building to take 5-6 days to complete, weather permitting. We'll continue to update project progress here on the blog as we make our way through the 4 buildings designated for painting. Thanks!

Waycliffe PW 2

Ponchos: high fashion in the painting business.

Waycliffe PW 3 antonio

Antonio sprays the siding on one of the buildings. 

Waycliffe PW

You can almost hear the buzz of the pressure washer. 

Monday, July 30th: Good afternoon residents of Waycliffe in Wayzata and welcome to your project blog! We'll be getting started at your association on Thursday, August 2nd. 

Set for completion in this summer's project is the prep and painting of 4 buildings (388/378, 368/358, 323/313, and 348/338) including: lap siding, board and batten siding, contrast fascia, front doors/frames, garage doors/frames, service door/frames, XLD window trim, flower boxes, louvers, shutters, decorative corbels, deck undersides, and lattice. 

We'll begin with pressure washing on Thursday, August 2nd. Please remove the contents of your deck and any small items from the outside of your home to allow safe and unobstructed access while washing. Once the washing is complete, you may return items to your deck. 

Once the substrates have had time to dry, we'll return onsite to begin prepping and painting the included surfaces and we anticipate to begin on the first building on Tuesday, August 7th. 

We anticipate each building will take about 4-6 days to complete, with weather being the biggest deterent from that schedule. 

Stay tuned here on the blog for progress updates, pictures, and any delays that may come up. Thanks! 

Isaac Vogel

Project Manager

Ph: 612-578- 2438

  • This email address is being protected from spambots. You need JavaScript enabled to view it.

Leave a comment

You are commenting as guest.

Request Your Free Estimate Today! Get A Free Estimate

facebook btn
linkedin btn
twitter btn
Reoll Painting

facebook btnlinkedin btntwitter btn