Villas at Sunset Bay – Blaine

Villas at Sunset Bay – Blaine

Project Complete

Greetings and welcome to your project blog for the 2019 painting project at Villas at Sunset Bay in Blaine. We are looking forward to being onsite with you!


 Route Map at Villas at Sunset Bay


Wednesday, July 24: Hello! 

We’ll be returning to paint the remaining residence doors on Saturday, 7/27 from 8am until 11am. The crew will be knowcking on doors and if you’re home, please open your door to be painted or leave a comment below to schedule an appointment during this time frame. Thanks!


Monday, July 22nd: Greetings! 

The painting crew has just about wrapped. We have a handful of front doors to paint— please ‘Leave a Comment’ below on the blog with the time you’d like for painting. Thanks!


Friday, July 19th:Hello and TGIF! 

Inspired by this ‘Fire-y’ hot weather we’re having, we wanted to share Jimmy Fallon’s Tonight Show video of the Avengers: Endgame cast singing ‘We Didn’t Start the Fire’ — now stay cool out there! 

Another day and more painted garage door frames and door. They are anticipating to finish up tomorrow, if the weather can cooperate – thanks and have a great weekend!

Taping off the window grids.


Thursday, July 18th: Greetings and Happy Hump Day!

As the 2019 Emmy Award nominees were recently announced, let’s throw it back to 2000 and a few of that’s year’s winners for #ThrowbackThursday:  Comedy Series- Will & Grace, Outstanding Drama Series – West Wing, Best Actor for Comedy Serious- Michael J Fox in Spin City, and Best Actress for Comedy Seriues- Patricia Heaton in Everybody Loves Raymond. Here’s the link for this year’s nominees. The Awards will be on September 22nd!

The crew continues on at Sunset Bay. They are anticipating to wrap up Friday, but Monday at the latest if there is any weather delay. We’re in the home stretch folks!

We’re halfway there!

Teamwork makes the dream work!


Wednesday, July 17th: Greetings! 

The crew has started at 11805 today with their prep and painting of included areas

2 by 2 we are prepping and painting your garages.

Taping of the transom windows.


Monday, July 15th: Good afternoon!

It’s going to be a scorcher this week so take care of yourself and stay hydrated! And often with hot weather comes thunderstorms so check back here on the blog for weather updates and delays on your project!

The crew is currently on 3014 Building and will be carrying on with garage doors frames and door frames. The completed areas are looking pretty great if we say so ourselves!

Pulling off the tape after painting the door frame.

 Team work on the 3 car garage.


Thursday, July 11th: Good afternoon!

The crew is cruising along the route and prepping and painting your trim areas. As mentioned the other day, they are working in groupings of paint colors and it will seem as though they are jumping around a bit- thanks!

Prepping and taping off one of the garage doors.

Taping around the garage frame, windows, and door.

Ever sprays one of the garage doors.


Wednesday, July 10th: Good morning! 

The crew started their prep and painting to your entry door trim and garage doors/trim; however, with the impending rain, they’ll be pressing pause and will resume as the weather allows. Stay tuned here for further updates. 

Also to note, for completing the painting of your garages and front door frames, the crew will be using one ‘color package’ throughout your association and then moving to the next ‘color package’ to complete those corresponding buildings and so on. This just means we’re not following the route per say, but using the paint color packages as a guide which will maximize efficiency. Thanks!


Monday, July 8th: Good afternoon!

The crew is off and running and beginning the pressure washing portion of the project. 

We’ve posted a site map above to show the route the crew will follow for pressure washing and painting the garage doors and frames. We are only prepping and painting in the ‘outer circle’ of the association and we apologize for any confusion this caused. 

For the door painting portion of the project, there will be select dates/times available for you to schedule a time to be home so we can paint your door in the open position. We’ll be finalizing the schedule soon for painting and will post as soon as we do— thanks for your patience!

Pressure washing one of the garage doors.

Cleaning and prepping the garage doors.


Monday, July 1st: Hello and welcome to your project blog!

We’ll be getting your project started on Monday, July 8th with pressure washing of the included areas: garage doors and frames throughout the association.

For the pressure washing, we are utilizing homeowner’s water spigots — please ensure yours are turned on for the pressure washing, which we anticipate with take 2 days to wash the included areas.

Once the pressure washing is complete, we’ll return to prep and paint the garage doors and frames and we ask that you are mindful of garage use as we make our way around the association to paint the doors.

As part of this project, we’ll be painting your front doors. This will require some participation from each homeowner to paint the doors while in the open position. Once we finalize a door schedule, we’ll post the schedule here on the blog as well as some sign up tables. You make comment on the blog or call our office to schedule a specific time to paint your door. Once painted, we require the door to remain open for 2-3 hours to ensure a complete dry time. Please be mindful of these details when scheduling a time to be home for the door painting. We will not be responsible nor will we perform touch ups from damages closing doors too early.

Stay tuned for further project details as we near your start date and continue with project progress. We’ll also post a completion route as well as a door schedule as they are available.

Thanks and have a great 4th of July!